Emergency Dining Area and Drama Studios for Myton School

Emergency Temporary RAAC Solutions for Myton School

Myton School faced an urgent need for temporary structures following the RAAC crisis that impacted several areas of their institution. Recognising the importance of minimising disruption to student education, Myton School turned to Fews for a swift and effective solution.

In response, Fews promptly delivered three essential structures, consisting of two external drama studios and a temporary dining area. The drama studios, measuring 10m x 10m and 10m x 15m respectively, were strategically positioned side by side with a safe ramped access connecting them. Both structures featured an insulated thermo roof and ISO thermal insulated panels to optimize energy efficiency.

The dining area, spanning 10m x 20m, also incorporated an insulated thermo roof and ISO thermal insulation panels for enhanced energy conservation, especially during winter. Additionally, the structure was equipped with glass walling, a glass double door with an emergency exit bar, and plastic gutters and downpipes along the side elevations.

Fews, drawing upon its extensive experience collaborating with schools and similar organizations, demonstrated a commitment to safety and adherence to necessary accreditations. The team’s precision and professionalism, proven through years of experience in supplying and constructing temporary structures, ensured the highest quality outcomes.

Specifications:

Drama Studios:

10m x 10m Clearspan Premium Structure with Apex PVC Roof on 3m Leg
10m x 15m Clearspan Premium Structure with Apex PVC Roof on 4m Leg
Thermo Insulated PVC Roof
40mm ISO Thermal Insulation Panels
2.5m Glass Double Door with Emergency Exit Bar
Access Ramps with Phenolic Timber Boards and Steel Handrails

Dining Area:

10m x 20m Clearspan Premium Structure with Apex PVC Roof on 3m Leg
Thermo Insulated PVC Roof Covers
Plastic Gutters & Downpipes to Side Elevations
ISO Thermal Insulation Panels
Glass Walling
Glass Double Door with Emergency Exit Bar

Fews Structures and Procedures When Working in Schools

Building structures on the site of a school, college or university presents unique challenges in both the structure specification and the procedures we adhere to.  In terms of the structure we focus on these things:

  • The structure is fit for purpose, whether that’s a classroom, sports hall or canteen
  • Energy efficient and sustainable – we use insulation, double glazing to make them easy to heat and cool
  • A proper environment for learning in terms of temperature and external noise levels
  • All access ramps are DDA compliant
  • Our site crews are fully trained 

Our RAMS (Risk Assessment and Method Statement) contains these items to ensure extra safety when schools are open during the build:

  • All site crew hold a current DBS
  • We try to schedule deliveries and other vehicle movements outside of school opening hours to ensure student safety
  • We have qualified Banksmen to guide vehicles during school hours when necessary to ensure there are no accidents involving students
  • Site safety and and a safe learning environment are a priority at all times
RAAC Solution Structure
Temporary dining area at Myton School
RAAC Solution Structure
Temporary dining area at Myton School
RAAC Solution Structure
Interior of temporary dining area
RAAC Solution Structure
Interior of temporary dining area
RAAC Solution Structure
Interior of temporary dining area
RAAC Solution Structure
Interior of temporary dining area
RAAC Solution Structure
Air conditioning system fitted to dining area
RAAC Solution Structure
Light fitted on exterior of dining area
RAAC Solution Structure
Double access glazed door with emergency exit push bar, canopy above and ramp
Double access glazed door with emergency exit push bar, canopy above and ramp
RAAC Solution Structure
Aerial shot of drama studio and classroom
RAAC Solution Structure
Aerial shot of drama studio and classroom
RAAC Solution Structure
Aerial shot of drama studio and classroom
RAAC Solution Structure
Thermo roof pump device
RAAC Solution Structure
Lighting rig above drama classroom
RAAC Solution Structure
Desk and interactive board placement inside of structure
RAAC Solution Structure
Computer desk placement inside of drama studio
RAAC Solution Structure
Drama studio
RAAC Solution Structure
Drama classroom
RAAC Solution Structure
Drama classroom with glass panel walling and double door access
Tree canopy
Industry Leading Sustainability
Find Out More
Matt
Molly
Lucy
Jack

Enjoy our industry-leading service - pick up the phone and let us do the rest.

Call 01527 821789 or email info@fews.co.uk

Matt, Molly, Lucy and Jack are our dedicated commercial team with extensive expertise and experience designing event solutions. One of them will guide you through every step of the process.

Request a Quote
Contact Us